Dear all,
Im aware of the SAP standard process for Goods issue to Manual Reservation/PM order in IM level first(MIGO)
and doing WM level TO creation(LT06) and TO confirmation(LT12).
My client would like to have the process initiated in WM since post IM level goods issue,
there are chances of stock issue discrepancy at wm level from warehouse.
In order to build this gap we are planning for a development as below but having
issue in clearance of positive qty Quant from 911 storage type.
Scenario as below.
1.Reservation is generated from PM order or Manual.
2. Created a program similiar to LT01 for direct multiple materials TO creation with reference to
Reservation which will read open reservation line items and create Transfer Order.
The transfer order created have the Actual bin as Source bin and Destination bin as Dynamic bin 911 stype(Reservation no)
3.Now during TO confirmation stock will be moved from Actual bin and destination bin 911 is having positive stock.
Post confirmation immediately triggeed a BAPI MB_CREATE_GOODS_MOVEMENT for Goods Issue against Reservation/PM order.
TR creation is deactivated for IM movement type to avoid a negative qty Quant line will get created.
Need suggestion on if there is any possibility through customization to clear automatic the 911 positive qty generated during TO confirmation or
after IM level goods issue.
Manual moving the qty from 911 to 999 differences etc doesn't suit since correct qty issue or clearance has to happen against order,reservation to flow cost correctly.
Looking forward for your valuable suggestions or solution if any one had customized on similar requirement.
I have gone through below posts which have been answered for similiar requirements.
http://scn.sap.com/thread/3242315
https://scn.sap.com/thread/3260837
Thanks in advance
Regards
Max